Elkhorn Playscape Replacement

Elkhorn students lost their playscape in September 2016.  With the tireless efforts by the School Council and generous donations from parents and the community, we were able to raise the necessary funds to rebuild a new playscape for Elkhorn students and the community to enjoy in October 2019.

 

Platinum Donor
IG Wealth Management

Gold Donor
Bui Family
Chow, Pyo & Yu Families
Clearly Orthodontics, Dr. Abbaszadeh
Dave Loewen
Elliot, Avery, Cameron
Hurwich Family
IKS Family
Wherry Family
Anonymous

Silver Donor
Albert Yu
Chess with Mr. S
Nan Liu

Bronze Donor
Bains & Manak
Joe Family
Kara Lee
Mehrdad Zarei
Sanai Family
Sharon Cho
In honour of Mason and Michelle
Anonymous

Donor
Abbas Kadzadeh
Amy Brenton
Amy Song
Ana Salazar
Avin Moayedi
Bill Thom, Re/Max Realtron
Chung Leung Chiu
Chunqing Dong
Cindy Sin Yee Lee
Diana Grondona
Donna Chang
Elif Durmus Bozada
Emily Viger
Greg Davydouski
Han Yu Zhao
Henry & Owen
Inga Ogneva
Ivan Carlos Caum
Jiyoun Lee
Jun Liu
Jwn-Jiun Lian
Kentaro Shimamoto
Kevin Trinh
Lan Shen
Leila Mofarah
Loknath B Chadalavada
Luci Mackay
Martina Zigova
Midhula Singavarapu
Miladian Homes
Mohamed Mehidi
Okan Sen
Peilin Qian
Petar Antic
Qinghua Xu
Robin Yuan
Sarah Cheng
Sumita Jha
Ting Pei Loo
Ye Yang
Yvonne Ho
In honour of Ayun Lee/Jongyun Lee
In honour of Ferdinand Simmons Zhang and Fulgencia Simmons Zhang
In honour of Ryder Liu and Helen Liu
Anonymous
Anonymous

 

 

Background and updates:

The project at Elkhorn PS was initiated by the Principal in December 2016. Through consultation with the school, the Terms of Reference were developed and approved in April 2017.

As part of the process, a representative from the TDSB Sustainability Office met with the Principal and a couple of parents and staff to review the details outlined in the Terms of Reference. From there, the school was responsible for submitting the first three milestones. This step was completed July 2017. From there the project was queued for design.

At the end of October 2017, an update was sent to the Principal to inform her that we will be arranging for a topographic survey to be completed in the next few months in preparation of the Master Plan. The intention is to start the design meetings with the steering committee in the spring of 2018 (subject to staff availability).

As described in the background section of the Terms of Reference, the Senior Manager of Sustainability recommended that the Board provide funding to support the initial design of the project. This was approved. As such, we don’t need any school funds in a project account until the detailed design stage (step 14). In this case, the project account can be set up just before the detailed design stage OR if the school would like to accumulate fundraising in the account beforehand (I can see how this might be confusing given that it is step 1 in the Terms).

In terms of the timeline, based on where we are in the process, we are realistically looking at construction in 2019 at the earliest. However, there are a number of factors that can influence the timeline. Fundraising is the big one. All the funds to cover the first phase of construction have to be in hand before the project can be tendered. The timeline will become more clear as the design is developed and preliminary costs are known.